By hand or by machine?

 It is often a cause for debate with wallers whether to use mechanical assistance to strip down and prepare walls. For me, on the majority of jobs I like to see the stone as it passes through my hands. In this way, I am able to grade it, assess the stone and separate into copes, throughs and super special bits that you need when building...the get out of jail bits that at times you need. (it's a waller thing!)

Having said all of that there are also times when having a digger, driven by a competent (and this is key) driver can save days and days of work.

Recently I and a colleague have been preparing a site where we have had to move around 90m of wall. It needs rebuilding away from the tangled mass of tree roots that have now grown under the wall. In addition, cattle have been allowed to graze close to the wall and have eroded the soil leaving the wall almost appearing suspended in places.






So, to have hand stripped this out, carrying each stone down a bank and laying it out; plus turfing the new line of the wall and removing loose topsoil would have been a time-consuming job, probably taking two of us a week. Instead with the help of machinery and a skilled operator who also builds walls and therefore knows exactly what we need...we were left with a site ready to build in 2 days. Perfect!





Comments

Popular posts from this blog

As a member of the Derbyshire Dry Walling Association I attended the Chatsworth Show where we built a beautiful wall commemorating the wallers who left the hills and Dales to fight in WW1

Ah, Ha...Ha

Thank goodness the weather has now picked up a lttle, it has felt a long time coming! This spring has seen some lovely projects so far including my first Ha Ha. A rebuild of an almost derelict wall, reinstating it to its original wavy line! Spring has obviously been the season for driveways and gateways as I have completed 2 more and am about to embark on another tomorrow

2019 - 2020 - A year not to be forgotten!

What a year 2020 has been...A year of working alone, not meeting with colleagues, no shows, no teaching and a number of jobs lost. Still, I consider myself blessed to have a job where I can be outside, not needing to worry about commuting or having to wear a face mask! In 2019 I finished 250m of a wall in Kirk Ireton which has become known as Emma's wall to friends and neighbours who walked past on a daily basis to observe progress. It was almost a 4 season wall! Finished! 2019 A group of wallers from the Derbyshire Branch of the DSWA spent 5 days on Orkney building a wall for a community. It was a memorable experience for us all and left a beautiful curved seat. 2019 Two operations on my hands slowed me down towards the end of the year! Extending and rebuilding a wall encompassing a wheel as a feature One of my most favourite walls to date in The Brund, a 60m retaining wall, all dry stone. A beautiful setting which I worked on during the fabulous weather of the first lockdown 2020